5 Steps to a Successful Office Move in Minneapolis
Moving your office doesn't have to mean chaos, lost productivity, and frustrated employees. With the right approach, you can relocate your Minneapolis business smoothly and even use the move as an opportunity to improve operations. Here are five essential steps.
Step 1: Assemble Your Move Team
No single person should bear the burden of an office move. Create a cross-functional team:
Key Roles:
- Move coordinator — Overall project manager (often facilities or office manager)
- IT lead — Handles technology migration, internet, and phone systems
- Department liaisons — One person per department to coordinate packing and communication
- Finance representative — Manages budget and vendor payments
- HR representative — Handles employee communication and concerns
First Meeting Agenda:
- Define scope and timeline
- Establish budget
- Assign responsibilities
- Set communication cadence (weekly check-ins recommended)
- Identify potential risks and mitigation strategies
Step 2: Create a Detailed Timeline
Work backward from your target move date:
16 Weeks Out
- Finalize new space lease
- Get commercial moving quotes (Blue Dolly offers free commercial estimates)
- Begin new space design and layout planning
- Order internet and phone service at new location
12 Weeks Out
- Book your mover
- Order new furniture (if needed)
- Begin IT migration planning
- Start non-essential packing (archives, storage items)
8 Weeks Out
- Communicate move details to all employees
- Send address change notifications to clients, vendors, partners
- Update website, Google Business Profile, and online directories
- Order new business cards, letterhead, and marketing materials
4 Weeks Out
- Department-level packing begins
- IT backs up all systems
- Confirm all logistics (parking, elevator, loading dock)
- Schedule cleaning for both old and new spaces
2 Weeks Out
- Final packing push
- IT disconnection plan finalized
- Employee orientation materials prepared
- Walk-through of new space with moving team
Move Week
- Execute the move (ideally Friday evening through Sunday)
- IT reconnection and testing
- Employee welcome and orientation Monday morning
Step 3: Manage Your IT Migration
IT is the most critical — and most risky — aspect of any office move.
Pre-Move
- Audit all equipment — Computers, monitors, printers, servers, phones, network gear
- Back up everything — Cloud backups, on-site backups, and off-site backups
- Label every cable — Use color-coded labels at both ends
- Photograph server rack connections — You'll thank yourself later
- Test new location infrastructure — Verify internet speed, power capacity, and network readiness
During the Move
- Shut down servers last — After business closes Friday
- Transport servers separately — Climate-controlled vehicle, not the moving truck
- IT team on-site at new location — Ready to reconnect as equipment arrives
- Test everything — Internet, phones, printers, VPN, email, and critical applications
Post-Move
- Monday morning support — IT available for employee issues
- 48-hour monitoring period — Watch for connectivity issues, slow performance
- Update all IP addresses, DNS records, and network configurations
- Verify security systems — Firewalls, access controls, surveillance
Step 4: Communicate Proactively
Internal Communication
Every employee should know:
- When: Exact move dates and their personal schedule
- What to pack: Clear instructions with supplies provided
- Where they'll sit: New floor plan with their assigned location
- How to get there: Parking, transit, building access at new location
- Who to contact: Move coordinator for questions
External Communication
Don't forget to update:
- Google Business Profile (critical for local SEO)
- Website contact page and footer
- Email signatures (company-wide)
- Social media profiles
- Client contracts and invoices
- Vendor and supplier accounts
- Insurance policies
- Business licenses and registrations
- USPS mail forwarding
Step 5: Execute and Follow Up
Move Day Best Practices
- Color-code by department — Each department gets a color for boxes and labels
- Number every box — Create a master inventory list
- Designate a command center — One person at old location, one at new
- Protect both spaces — Floor runners, door frame pads, elevator protection
- Stay flexible — Things will go differently than planned; adapt quickly
Post-Move Follow-Up
- Week 1: Daily check-ins with department liaisons
- Week 2: Survey employees about issues or needs
- Month 1: Review budget vs. actual costs
- Month 2: Employee satisfaction survey
- Month 3: Lessons learned documentation
Minneapolis Commercial Moving Tips
Building Management
- Submit COI (Certificate of Insurance) to both building managers
- Reserve freight elevators at both locations
- Confirm after-hours access for weekend moves
- Check loading dock specifications (height, width, weight limits)
Parking and Logistics
- Apply for temporary no-parking signs if needed
- Plan for downtown Minneapolis one-way streets and traffic patterns
- Avoid scheduling moves during Twins, Vikings, or major event days
- Consider starting early Saturday morning when traffic is lightest
Weather Backup Plan
Always have a weather contingency:
- Winter: Ice melt, floor protection, heated staging areas
- Summer: Hydration for the crew, avoid moving electronics in extreme heat
- Spring/Fall: Monitor for severe weather and tornado watches
Get Your Free Commercial Moving Quote
Blue Dolly has moved dozens of Minneapolis businesses — from startups to established enterprises. Our dedicated project management approach ensures your move is planned, executed, and completed with minimal disruption.
Get a free commercial quote or call (612) 400-9989.
Blue Dolly Moving specializes in commercial relocations throughout the Twin Cities. Call (612) 400-9989.